色欲午夜无码久久久久久张津瑜,第九色区av天堂,狠狠躁日日躁夜夜躁A片小说按摩,几天没C是不是又痒了网站,老熟女交换五十路交换A片视频,办公室人妻滋味,把插八插露脸对白内射,精品国产粉嫩内射白浆内射双马尾,荫蒂添得好舒服A片视频,全黄H全肉禁乱公

Shandong Jiayi Machinery Sheet Metal Equipment Manufacturing Base

+86 137-0538-4901 +86 189-5381-3118 |

sdjy@lag-rainer.com

中文 - ENGLISH

Technical

技術優勢

TECHNOLOGY

Current location:Shandong Jiayi Machinery Co., Ltd. > TECHNOLOGY

Lower beam assembly structure

The lower beam of LAG press brake, use of the unique bolted structure. Three plates use of special materials, and the gap between the plates, to ensure that during the crowning compensation, the plate directly slide relative freely, and ensure to go back to the initial position.

Lower beam assembly structure

On both sides of the lower beam, there are two pins, which are used for connection to the frame while limiting the relative movement of the plate in accordance with the center of the pin. On this way, when the lower beam is pushed up, the highest position from the top, must be in the center surface of the lower beam. The pin design assures the best compensation, at the same time, restoring the lower beam to the original position when the crowning compensation cylinder are not working.

Lower beam assembly structure

Telephonee:

+86 13705384901

Build Geshi international technology brand

CONTACT US

Tel:+86 13705384901 +86 18953813118 +86 0538-5608989

E-mail:sdjy@lag-rainer.com

Add:South of Kuixing Road, north of Xingfu Road, Ciyao Town, Ningyang County, Tai'an City, Shandong Province, China

主站蜘蛛池模板: 扶沟县| 西乌珠穆沁旗| 比如县| 蓝田县| 望城县| 湘乡市| 东安县| 连云港市| 永兴县| 雅安市| 连州市| 荥经县| 富宁县| 辽宁省| 邵阳县| 大理市| 吉首市| 平和县| 金山区| 滕州市| 屏边| 肇东市| 鄢陵县| 孝义市| 谢通门县| 保靖县| 平山县| 新干县| 蒙城县| 准格尔旗| 兴宁市| 尼木县| 开化县| 聊城市| 高碑店市| 岑巩县| 沂源县| 泰州市| 苍山县| 舟山市| 广宁县|