色欲午夜无码久久久久久张津瑜,第九色区av天堂,狠狠躁日日躁夜夜躁A片小说按摩,几天没C是不是又痒了网站,老熟女交换五十路交换A片视频,办公室人妻滋味,把插八插露脸对白内射,精品国产粉嫩内射白浆内射双马尾,荫蒂添得好舒服A片视频,全黄H全肉禁乱公

Shandong Jiayi Machinery Sheet Metal Equipment Manufacturing Base

+86 137-0538-4901 +86 189-5381-3118 |

sdjy@lag-rainer.com

中文 - ENGLISH

Technical

技術優勢

TECHNOLOGY

Current location:Shandong Jiayi Machinery Co., Ltd. > TECHNOLOGY

Lower beam assembly structure

The lower beam of LAG press brake, use of the unique bolted structure. Three plates use of special materials, and the gap between the plates, to ensure that during the crowning compensation, the plate directly slide relative freely, and ensure to go back to the initial position.

Lower beam assembly structure

On both sides of the lower beam, there are two pins, which are used for connection to the frame while limiting the relative movement of the plate in accordance with the center of the pin. On this way, when the lower beam is pushed up, the highest position from the top, must be in the center surface of the lower beam. The pin design assures the best compensation, at the same time, restoring the lower beam to the original position when the crowning compensation cylinder are not working.

Lower beam assembly structure

Telephonee:

+86 13705384901

Build Geshi international technology brand

CONTACT US

Tel:+86 13705384901 +86 18953813118 +86 0538-6089096 +86 0538-6089189

E-mail:sdjy@lag-rainer.com

Add:South of Kuixing Road, north of Xingfu Road, Ciyao Town, Ningyang County, Tai'an City, Shandong Province, China

主站蜘蛛池模板: 湄潭县| 建瓯市| 木兰县| 海阳市| 融水| 文山县| 梓潼县| 咸丰县| 长沙县| 准格尔旗| 十堰市| 东乌珠穆沁旗| 醴陵市| 白山市| 嘉峪关市| 翁源县| 青河县| 嵊州市| 江川县| 天镇县| 罗山县| 丽江市| 南木林县| 乌拉特后旗| 砀山县| 浮梁县| 南岸区| 云安县| 乌兰县| 涿州市| 太仓市| 兰考县| 色达县| 旬邑县| 安宁市| 崇左市| 那曲县| 陇川县| 郁南县| 寿宁县| 高唐县|